On Tuesday, November 26, 2024 a 4-inch chilled-water pipe in the Solar Dynamics Observatory (SDO) Joint Science Operations Center (JSOC) server room broke. This caused major flooding in the building and extensive water damage in the lab that houses the machines that process and distribute data from the Helioseismic and Magnetic Imager (HMI) and Atmospheric Imaging Array (AIA) instruments and from the IRIS spacecraft. The Stanford JSOC team is working to assess the extent of the damage, but it is severe. Science data processing for HMI, AIA, and IRIS will be down for an extended length of time, as will access to the archived data at JSOC.
https://solarweb1.stanford.edu/JSOC_Emergency_Resources.html